Project:   Kitfox - Series 7   -   VIEW REPORTS
Total Hours:1393.7
Total Flight Time:0.4
Start/Last Date:Mar 06, 2021 - Apr 06, 2024
Engine:Rotax 912is
Propeller:Whirlwind
Panel:Garmin G3x
 
Friendly URL: https://eaabuilderslog.org?s=Geek

Home or Last Project Picture

Mar 26, 2023     Naca Duct, Radiator and Wing Wire - (9 hours)       Category: Fuselage
Finished fairing in the naca duct on the lower cowl and gave it a coat of primer. Fabricated the brackets to mount the oil cooler to the radiator and then mounted the assembly on to the plane. Finally achieved one of the first rites of passage where I took the left wing off of the rotisserie and pulled the wiring and pitot system tubing through. Secured the wiring at the wing tip with Adel clamps and then consolidated all the wiring in the left wing into a single connector so I have a wing wiring disconnect should I need to remove the wing at a later time.


 